This past week we hit the 52 day mark in our hotel and it was a low point for me. I was feeling that we had nothing good to report. No rental house, no repairs made, no contractors hired, no
progress. It seemed like we had been working really hard, but had nothing to show for it. Yesterday the fog (literal fog) cleared and we were finally blessed with a sunny day. Only then did I realized that we do have good news to report.
Burton has contacted and gotten bids from multiple contractors for the framing, roofing, electrical, and stucco work that needs to be done. We also met with an engineer who is going to begin working on our engineering issues.
Yikes! I don’t think we have told anyone yet about our “engineering issues.” Because our roof is very big and very heavy (concrete tiles), and because of a framing decision made by our original builder (that probably never would have caused any problems at all if not for the fire), and because of the fire causing all of the weight of the roof to concentrate onto what support beams are remaining up there, our house has shifted. The upstairs hall-wall is now supporting the entire roof, causing it to sag a bit (about 3/4 of an inch). So, new support beams will be added in the first floor ceiling and a new support post along the wall. The upstairs hall window will also be reinforced as the beam resting on it is causing some buckling. I doubt this will reverse the “big shift.” So, I guess the windows in Alex’s room will always be difficult to get up and down, and certain doors will stick from here on out. Isn’t it amazing was a little fire in
the attic will do? The great thing is that only a little more drywall will have to be removed. Most of the engineering repair areas are already exposed because of the fire/water damage. Yet more good news.
Mom and I have the playroom almost completely packed up and shipped off. We plan on turning it into somewhat of a temporary living room. The guest room is back in working order and Troy’s room has been plastered and painted. Now it just needs to have wood floors installed and all the trim and baseboard replaced. Yeah!
Speaking of the boys -- Alex and Troy loved their surf trip to Costa Rica. Alex got back just in time for school last week and Troy got home Tuesday night. They had a blast and can’t wait to go back again. They don’t know it yet, but we ALL plan on going with them, although we may not be staying at a surf hostel with them. . .
We did have good news to report. I just needed the fog to clear so I could see it.